| Owner: | Bach Khoa A Chau Tay Ninh Joint Stock Company |
| Capacity: | |
| Service provision period: | Operation in May 2024 - NOW |
| Scope of work: | Operation and maintenance management of 110kV transmission line of Tri Viet 1 Solar Power Plant - Bach Khoa A Chau 1 - Tan Chau 1 and 110kV Switching station |
Tay Ninh solar power 110kV Switching station connects to the 110kV transmission line Bourbon – Tan Hung used to connect with the Tri Viet 1 Solar Power Plant Project – Bach Khoa Asia 1 – Tan Chau 1 with 3 circuits of the 110kV transmission line 7.4 km long ACSR120 conductor is connected from the 22/110kV step-up substation of Bach Khoa A Chau solar power plant, Bach Khoa Tri Viet 1 solar power plant to Tay Ninh 1 solar power 110kV switching station 110kV transmission line. The 14.175 km long ACSR185/29 conductor is connected from Tan Chau solar power 22/110kV step-up substation to Tay Ninh 1 solar power 110kV switching station.