KOSY BAC LIEU
Owner: Bac Lieu Kosy Wind Electric Joint Stock Company (Kosy Group)
Capacity: 40 MW
Service provision period: Operation in September 2021 - September 2022
Scope of work: O&M services for Substation and Transmission line

Kosy Bac Lieu Wind Power Plant was built in a shrimp farming area of Hoa Binh district, Bac Lieu Province, and invested by Bac Lieu Kosy Wind Electric Joint Stock Company – a member of Kosy Group.
As an O&M Contractor for 220kV Substation, POM’s operation team is not only committed to a safe operation for the Substation with availability at least 99% but also closely cooperates with Goldwin contractor in turbine operation and troubleshooting.