| Owner: | Bac Lieu Kosy Wind Electric Joint Stock Company (Kosy Group) |
| Capacity: | 40 MW |
| Service provision period: | Operation in September 2021 - September 2022 |
| Scope of work: | O&M services for Substation and Transmission line |
Kosy Bac Lieu Wind Power Plant was built in a shrimp farming area of Hoa Binh district, Bac Lieu Province, and invested by Bac Lieu Kosy Wind Electric Joint Stock Company – a member of Kosy Group.
As an O&M Contractor for 220kV Substation, POM’s operation team is not only committed to a safe operation for the Substation with availability at least 99% but also closely cooperates with Goldwin contractor in turbine operation and troubleshooting.